HEOL Y GLYN HOME  -  WALK AROUND WALES HOME  -  20250505R-WBIF-P2008-1462

GEO-TECHNICAL and GEO-ENVIROMENTAL REPORT

20250505R-WBRP-geo-technical

 

 

20250505R-WBRP-geo-technical 85.jpg (88667 bytes) GEO-TECHNICAL and GEO-ENVIROMENTAL REPORT - Prepared for Moore Knight Limited by Terra Firma (Wales) Limited submitted to NPTC for P2008/1462 Heol-y-Glyn development 20250505R-WBIF-P2008-1462 . Also saved as: 20080500a-DO-TFIR-geo.rpt.cuddy - CLICK HERE . Submitted in two different versions 41 pages and 149 pages.

 

20260713S-WBAN-geo-tech FALSE-TRUTH CASE STUDY - DOCUMENT ANALYSIS - Analysis of the pathway and process for this document to cover up historical tipping by the council.

 

20250505R-DORP-geo-technical-2

85.jpg (88667 bytes) GEO-TECHNICAL and GEO-ENVIROMENTAL REPORT - Prepared for Moore Knight Limited by Terra Firma (Wales) Limited.

A 149 page extensive report that includes ordnance survey maps that clearly show a domestic spoil heap at the top endf of the site. 

20250505R-DORP-geo-technical

85.jpg (88667 bytes) GEO-TECHNICAL and GEO-ENVIROMENTAL REPORT - Prepared for Moore Knight Limited by Terra Firma (Wales) Limited.

41 page abbreviated version to include only 1 map, 1921 from which the status of the land was defined.

 

This document contains a mass of information relating to the site including the identification of contaminated ground and advice against building on the peat bog, however there are several contradictions contained in the report relating to its historical use as a tip. For example the majority of the land is made up mainly of 'made ground, (landfill) yet the report says there has never been a tip on site ever.

 

IMAGE BANK

89.jpg (231992 bytes) wx/89 20250505R-WBIF-P2008-1462 - application documents
79.jpg (103974 bytes) wm/79 20250505R-WBIF-P2008-1462 - marked for analysis on 20260713S-WBAN-geo-tech
78.jpg (24115 bytes) wm/78 20250505R-WBIF-P2008-1462 - marked for analysis on 20260713S-WBAN-geo-tech
     
48.jpg (254934 bytes) wo/48 20250505R-WBIF-P2008-1462 - 2008/1462 - council planning documents page with information removed. Image saved on 25/4/2026
51.jpg (461971 bytes) wy/51 20080500-TFIR report - exec summary to include 'fields'
50.jpg (463972 bytes) wy/50 20080500-TFIR report - exec summary to include 'fields' highlighted
49.jpg (467836 bytes) wy/49 20080500-TFIR report - exec summary to include 'fields' highlighted and no action since 1977 highlighted. 
82.jpg (212728 bytes) wx/82 20250505R-DORP-geo-technical-2 - (page 27)  7.4 Potential Pathways - ingestion of soil & dust - Inhilation of soil, dust and vapours. Surface water run off - measures should be taken.
81.jpg (257218 bytes) wx/81 20250505R-DORP-geo-technical-2 - (page 26) section 7 - Risk Assessment/Mitigation measures - Site Summary - Potential Contaminants - Potential receptors 
  63.jpg (505067 bytes) yq/63 20250505R-WBRP-geo-technical  combination image. trial pit testing with elevated levels of contamination together with potential receptors to include 'neighbouring residents' via Ingestion, Inhilation and Dermal Contact.  
52.jpg (355355 bytes) wr/52 P2008/1462 Heol-y-Glyn development
GEO-TECHNICAL and GEO-ENVIROMENTAL REPORT
- Prepared for Moore Knight Limited by Terra Firma (Wales) Limited  -  page 12  -  The Envirocheck confirms that no historical or current landfill sites situates within 1km of the site.
62.jpg (219657 bytes)   20250505R-WBRP-geo-technical  - trial pit testing with elevated levels of contamination. TP3, 5, 9 & 10
61.jpg (285580 bytes)   20250505R-WBRP-geo-technical  potential receptors to include 'neighbouring residents' via Ingestion, Inhilation and Dermal Contact.  
64.jpg (390331 bytes)   20250505R-WBRP-geo-technical  - 

Potential contaminants,  TP3, 5, 9 & 10 arsenic, zinc & benzo(a)pyrene

Potential receptors include neighbouring site users. 

Potential risks include dust ingestion.

77.jpg (62490 bytes) wm/77 20250505R-WBRP-geo-technical - rpt 1 pdf front page screen shot for 20260713S-WBAN-geo-tech  
76.jpg (54188 bytes) wm/76 20250505R-WBRP-geo-technical - rpt 2 pdf front page screen shot for 20260713S-WBAN-geo-tech  
74.jpg (50051 bytes) wm/74 20250505R-WBRP-geo-technical - rpt 1 page 86 screen shot to show made ground info 20260713S-WBAN-geo-tech  
73.jpg (79018 bytes) wm/73 20250505R-WBRP-geo-technical - rpt 1 page 86 screen shot to show made ground info 20260713S-WBAN-geo-tech  
     

MAP SERIES INFORMATION - SAMPLES

There are three series of maps included in the report. 1:2,500 , 1:10,560 and a 1:50,000 geology series.

 

59.jpg (134618 bytes) wr/59 20250505R-WBRP-geo-technical - map image 1921, scale  1:10,560. This map appears in both the 41 and 149 page reports. 
58.jpg (229990 bytes) wr/58 20250505R-WBRP-geo-technical - map image 1983, scale 1:2,500.  This map only appears in the 149 page report. 
57.jpg (330508 bytes) wr/57 20250505R-WBRP-geo-technical - map image 1981scale 1:2,500. This map only appears in the 149 page report. It clearly shows a spoil heap exists at the site. 
56.jpg (244344 bytes) 58.jpg (155145 bytes) wr/56 20250505R-WBRP-geo-technical - map image comparison 1921-1981  +1000  - 1981 map with council rubbish tip spoil heap marked.

TRIAL PIT TESTING WITH ELEVATED CONTAMINANTS  

29.jpg (253451 bytes) wm/29 20250505R-WBRP-geo-technical  pg 115 - 6 samples included - issue 3 (?) the samples are air dried prior to testing - only 6 out of the 11 trial pits have been tested for contamination while 10 out of the 11 trial pits show made ground as the main composition of the land.
37.jpg (136507 bytes) wm/37 20250505R-WBRP-geo-technical TP3 land composition
31.jpg (244307 bytes) wm/31 20250505R-WBRP-geo-technical TP3 soil composition, chemical testing
36.jpg (143076 bytes) wm/36 20250505R-WBRP-geo-technical TP5
30.jpg (253208 bytes) wm/30 20250505R-WBRP-geo-technical TP5 soil composition
35.jpg (137239 bytes) wm/35 20250505R-WBRP-geo-technical TP9
34.jpg (136701 bytes) wm/34 20250505R-WBRP-geo-technical TP10

 

BORE-HOLE TESTING SAMPLES

33.jpg (206316 bytes) wm/33 20250505R-WBRP-geo-technical BH3 shows the landfill at this point to be 8 metres deep. 
32.jpg (214174 bytes) wm/32 20250505R-WBRP-geo-technical Bore Hole testing sample 3 shows the landfill at this point to be at least 8 metres deep. 
     

 

 

HEOL Y GLYN HOME  -  WALK AROUND WALES HOME